Concrete Connect editor Clare Howcutt-Kelly visits HS2's 185m-long Balsall Common bridge, which used 7,200 cubic metres of concrete and 1,800 tonnes of steel in its construction
Sustainable technology firm, in conjunction with Inverurie Pre-Cast, manufactured concrete blocks for defence at the South Breakwater of the North Harbour